Skip to content
INDO RAYA TENAGA

INDO RAYA TENAGA

INDO RAYA TENAGA

  • Home
  • About Us
    • Vision & Mission Value
    • Sponsor
    • Our Management
      • Board of Directors
      • Board of Commissioners
  • Our Projects
    • Project Location
    • Summary of Project
    • Project Consultants
    • Technology
      • General Process
      • Steam Generator / Boiler
      • Steam Turbine & Generator
      • Environmental Technology
    • Ethics & Governance
      • Code of Ethics & Governance
      • Board Manual
      • Manpower Policy
    • Environment, Health, Safety & Sustainability
      • ESIA
      • Emission Control
      • EHS & ESMS
      • Stakeholders Management Plan
  • News & Media
    • Awards and Events
    • Project Milestones
    • Corporate Social Responsibilty
  • Tender Announcement
  • Contact Us
  • Bahasa Indonesia Bahasa Indonesia
    • English English
  • Career

Category: Awards and Events

 

Award From Cilegon City

As part of the 35,000 MW Generator National Strategic Project of Indonesian government, the construction of PLTU Jawa 9 & 10 has been one of the biggest investment contributors in Cilegon. Due to this performance, Indo Raya Tenaga, as the developer of the project, was acknowledged by the Cilegon City Government and Mayor Helldy Agustian as a Foreign Investment Company and Recipient of the 2023 Cilegon City Investment Award.

Penghargaan Dari Kota Cilegon

Sebagai bagian dari Proyek Strategis Nasional Pembangkit 35.000 MW yang diusung oleh pemerintahan Indonesia, proyek pembangunan PLTU Jawa 9&10 menjadi salah satu penyumbang investasi terbesar di Cilegon. Atas performa tersebut, Indo Raya Tenaga selaku pengembang proyek ini dilegitimasi oleh Pemerintahan Kota Cilegon dan Wali Kota Helldy Agustian sebagai Perusahaan Penanaman Modal Asing Penerima Investment Award Kota Cilegon Tahun 2023.

 

PLTU USC Jawa 9&10 Siapkan Teknologi SCR Dengan Amonia Hijau Untuk Minimkan Emisi

Background: Indonesia is promoting renewable energy transition. If managed correctly and sourced sustainably, green, and blue ammonia may be part of the renewable energy transition roadmap as clean alternative energy or co-firing source for coal steam power plants. Latar Belakang: Indonesia sedang mempromosikan transisi energi terbarukan. Apabila pengelolaan dan keberlangsungan sumbernya tersedia, maka amoia biru dan hijau dapat menjadi salah satu bagian dari perjalanan menuju transisi energi terbarukan, sebagai sumber energi bersih alternatif bagi pembangkit tenaga uap batu bara.
When ammonia is burned in steam boiler, it will leave no carbon footprint but unavoidably emit greenhouse gas called nitrogen oxides. Pembakaran ammonia di dalam tungku uap tidak akan menghasilkan emisi karbon, namun pembakaran tersebut tetap mengeluarkan emisi gas rumah kaca berupa nitrogen oksida
As an answer, Selective Catalytic Reduction is a proven technology for reducing of nitrogen oxides and nitrogen dioxide by converting the molecules into pure water and harmless nitrogen.   Utilizing Selective Catalytic Reduction in coal steam power plant together with a low Nox burner will dramatically reduce nitrogen oxide and nitrogen dioxide emission and therefore will open an opportunity to co-firing significantly more green ammonia than of coal in coal steam power plants. Sebagai jawabannya, Selective Catalytic Reduction adalah teknologi yang sudah terbukti untuk menurunkan nitrogen oksida dan nitrogen dioksida dengan mengkonversikan molekulnya menjadi air dan nitrogen bebas.   Dengan menggunakan Selective Catalytic Reduction pada pembangkit tenaga uap batu bara bersamaan dengan low Nox burner akan secara siknifikan menurunkan kadar nitrogen oksida dan nitrogen dioksida dan oleh karena itu akan membuka kemungkinan co-firing jauh lebih banyak amonia hijau dibandingkan batu bara di dalam pembangkit tenaga uap batu bara.
The MOU: Jawa 9 & 10 is an award-winning OECD-made Ultra Super Critical Power Plant for being the only and most complete emission-controlled power producer in Indonesia by installing Flue Gas Desulfurization, Electro-Static Precipitator, Low NOx burner and Selective Catalytic Reduction. Nota Kesepahaman: Jawa 9 & 10 adalah pembangkit Ultra Super Critical peraih penghargaan sebagai satu-satunya pembangkit di Indonesia yang memasang peralatan pengontrol emisi terlengkap dengan adanya Flue Gas Desulfurization, Electro-Static Precipitator, Low NOx burner dan Selective Catalytic Reduction.
Being the only Power Plant in Indonesia to be equipped with Selective Catalytic Reduction, Jawa 9 & 10 is conducting a joint study with PLN Engineering for co-firing of 60% green ammonia with 40% coal. Jawa 9 & 10 will be ready for significant co-firing of green ammonia when and if PLN direction towards this alternative fuel source is available in the future. Sebagai pembangkit satu-satunya di Indonesia yang sedang dilengkapi dengan Selective Catalytic Reduction, Jawa 9 & 10 melakukan studi bersama dengan PLNE dalam rangka kemugkinan co-firing 60% amonia hijau dengan 40% batu bara. Jawa 9 &10 nantinya akan siap untuk co-firing amonia hijau yang siknifikan pada saat dan jika arahan PLN tentang sumber bahan bakar alterrnatif tersebut tersedia di masa mendatang.
About Jawa 9 & 10: Jawa 9 & 10 is project-financed internationally since November 2020 and is sponsored 51% by PLN Indonesia Power group, 34% by Barito Pacific group, and 15% by Kepco group.   This BOOT project is made bankable under a 25-year PPA that requires no government guarantees. By October 2022, Jawa 9 & 10 is at 81% EPC stage and is expected to be commissioned by the last quarter of 2024 and COD by second quarter of 2025 Tentang Jawa 9 &10: Jawa 9 & 10 didanai dengan skema project finance sejak November 2020 dan disponsori 51% oleh grup PLN Indonesia Power, 34% oleh grup Barito Pacific, dan 15% oleh grup Kepco.   Proyek BOOT ini dibuat bankable lewat PPA 25 tahun yang tidak memerlukan jaminan pemerintah. Pada bulan Oktober 2022, Jawa 9 & 10 sudah mencapai tingkat EPC 81% dan diharap akan komisioning pada kwartal terakhir tahun 2024 dan akan COD di kwartal kedua tahun 2025.  

Coal is often accused of causing air pollution and being the biggest emitter. Indonesian government along with 23 nations made new commitments during the COP26 conference in Scotland on Nov. 4 to phase out unabated coal power. However, Indonesia still needs more energy to support the economic growth, and coal among other produce a very competitive price of electricity.

Therefore, the company understands this, and believes the use of coal-saving technology will improve the protection of the livelihood of the surrounding community.  This concern brings

PT Indo Raya Tenaga (IRT) to implement emission-reduction technology in its power plants; Jawa  9 & 10 by using OECD-standard Ultra Super Critical (USC) aimed at reducing emissions. The application of that technology will help to cut greenhouse emissions by more than 20%.

Despite South Korea’s plan to halt funding for coal-powered plant, the East Asian country is still committed to funding the Jawa 9 & 10 power plants as one and only power plant using the USC technology in Indonesia. This makes the project remains on track during pandemic.

The USC technology applied in Jawa 9 & 10 steam power plants also has gained national and international appreciation.

In Indonesia, the management awarded with Indonesia Green Award in 2021 for pioneering eco-friendly coal-steamed power plants by implementing advanced eco-friendly technology. The award presented by Indonesia’s Ministry of Environment and Forestry. The ministry also stated that PT IRT can be a role model for raising awareness of maintaining sustainability.

Whilst in the international scope, The USC Jawa 9&10 power plant won several prestigious international awards from the Asian Power Award, ALB Thomson Reuters and IJGlobal as the Power Plant with the best project funding in 2020 and 2021.

Recently,  PLTU Jawa 9&10 is stated as one of the largest contributors to investment in Cilegon. The investment increase was recognized by the Ministry of Investment or the Investment Coordinating Board (BKPM) of the Republic of Indonesia even though it is still in the Covid-19 pandemic.

Find Us

Address
PT.Indo Raya Tenaga
Sentra Senayan II, Lt. 17
Jl. Asia Afrika Lot 8 Jakarta Pusat
Jakarta, Indonesia, 10270
T. +62(21) 57900202 F. +62(21) 57900208

Email. info@irt.co.id
www.irt.co.id

  • Email
PT.Indo Raya Tenaga
Sentra Senayan II, Lt. 17
Jl. Asia Afrika No. 8 Jakarta Pusat
Jakarta, Indonesia, 10270
T. +62(21) 57900202 F. +62(21) 57900208
Site Office
Site Office Proyek PLTU Jawa 9&10
Jalan Yos Sudarso, Kel. Suralaya
Kel. Suralaya, Kec Pulomerak, Kota Cilegon
Banten 42439

Copyright © 2022 Indo Raya Tenaga

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are ok with it.Ok