Skip to content
INDO RAYA TENAGA

INDO RAYA TENAGA

INDO RAYA TENAGA

  • Home
  • About Us
    • Vision & Mission Value
    • Sponsor
    • Our Management
      • Board of Directors
      • Board of Commissioners
      • Senior Management & Advisor
  • Our Projects
    • Project Location
    • Summary of Project
    • Project Consultants
    • Technology
      • General Process
      • Steam Generator / Boiler
      • Steam Turbine & Generator
      • Environmental Technology
    • Ethics & Governance
      • Code of Ethics & Governance
      • Board Manual
      • Manpower Policy
    • Environment, Health, Safety & Sustainability
      • ESIA
      • Emission Control
      • EHS & ESMS
      • Stakeholders Management Plan
  • News & Media
    • Awards and Events
    • Project Milestones
    • Corporate Social Responsibilty
    • Bulletin
    • Press Release
    • E-Procurement ↗
  • Contact Us
  • Multilanguage switcher
  • Career

Blog

World Environment Day 2026: PT Indo Raya Tenaga Supports the Preservation of Merak Kecil Island

In commemoration of World Environment Day 2026, PT Indo Raya Tenaga (IRT) organized an environmental activity themed “Inspired by Nature, For Climate, For Our Future” at Merak Kecil Island on 11 June 2026.

The activity included the planting of 60 sea almond and coconut tree seedlings, as well as a coastal clean-up initiative around Merak Kecil Island as part of efforts to preserve the local environment.

On this occasion, PT Indo Raya Tenaga also provided a water pump to the Anak Pulo Community. The assistance is expected to support the availability and distribution of clean water on Merak Kecil Island.

Hari Lingkungan Hidup Sedunia 2026: PT Indo Raya Tenaga Dukung Kelestarian Pulau Merak Kecil

Dalam rangka memperingati Hari Lingkungan Hidup Sedunia 2026, PT Indo Raya Tenaga (IRT) menyelenggarakan kegiatan bertema “Inspired by Nature, For Climate, For Our Future” di Pulau Merak Kecil pada 11 Juni 2026.

Kegiatan ini meliputi penanaman 60 bibit pohon ketapang laut dan kelapa serta aksi bersih-bersih sampah di area Pulau Merak Kecil sebagai upaya menjaga kelestarian lingkungan.

Pada kesempatan tersebut, PT Indo Raya Tenaga juga menyerahkan bantuan mesin pompa air kepada Komunitas Anak Pulo. Bantuan ini diharapkan dapat mendukung ketersediaan dan distribusi air bersih di Pulau Merak Kecil.

https://www.bantenraya.com/daerah/16063550/hari-lingkungan-hidup-sedunia-pt-irt-jaga-kelestarian-wisata-pulau-merak-kecil

Creative Writing and Content Creation Training – Second Batch

On April 27, 2026, PT Indo Raya Tenaga once again organized the “Creative Writing and Content Creation Training” attended by 30 students of SMKN 4 Kota Cilegon, Lebak Gede Subdistrict. Previously, a similar training program was first held at SMAN 4 Kota Cilegon, Suralaya Subdistrict, in October 2025.

The training program, which took place from 27–30 April 2026, was designed to equip participants with writing skills and the ability to create positive, inspiring, and engaging social media content.

Pelatihan Penulisan dan Pembuatan Konten Kreatif – Batch II

Pada 27 April 2026, PT Indo Raya Tenaga kembali menyelenggarakan “Pelatihan Penulisan dan Pembuatan Konten Kreatif” yang diikuti oleh 30 taruna dan taruni SMKN 4 Kota Cilegon, Kelurahan Lebak Gede. Sebelumnya, pelatihan serupa pertama kali diselenggarakan di SMAN 4 Kota Cilegon, Kelurahan Suralaya, pada Oktober 2025.

Program pelatihan yang berlangsung pada 27–30 April 2026 ini dirancang untuk membekali peserta dengan keterampilan menulis serta kemampuan menciptakan konten media sosial yang positif, inspiratif, dan menarik.

A Community Earth Day Celebration by PT Indo Raya Tenaga and SMPN 10 Cilegon

On April 22, 2026, PT Indo Raya Tenaga together with SMPN 10 Cilegon held an Earth Day event themed “Our Strength, Our Planet.” The event was attended by 100 participants, including the principal, teachers, students, and representatives of the local community. The series of activities included educational sessions on the importance of environmental conservation, followed by an introduction to and hands-on practice of creating biopores, as well as the donation of recycled plastic bottle bins to support school cleanliness.

Perayaan Hari Bumi Bersama oleh PT Indo Raya Tenaga dan SMPN 10 Cilegon

Pada 22 April 2026, PT Indo Raya Tenaga bersama SMPN 10 Cilegon menggelar kegiatan Hari Bumi dengan tema “Our Strength, Our Planet.” Kegiatan ini diikuti oleh 100 partisipan yang terdiri dari Kepala Sekolah, guru, siswa, serta perwakilan warga sekitar. Rangkaian kegiatan meliputi edukasi mengenai pentingnya menjaga lingkungan, dilanjutkan dengan pengenalan serta praktik pembuatan biopori, serta diakhiri dengan donasi tempat sampah botol plastik daur ulang sebagai bentuk dukungan terhadap kebersihan lingkungan sekolah.

PT Indo Raya Tenaga Supports Cilegon City Government’s Free Homecoming Program for Residents

PT Indo Raya Tenaga (IRT) supported the Cilegon City Government’s free homecoming program by providing one bus with a capacity of 50 passengers bound for Purwokerto, Central Java. The send-off ceremony for the free homecoming program was held in front of the Cilegon Mayor’s Office on Sunday (March 15, 2026).


PT Indo Raya Tenaga Dukung Pemkot Cilegon Berangkatkan Warga Mudik Gratis

PT Indo Raya Tenaga (IRT) memberikan dukungan terhadap program mudik gratis Pemerintah Kota Cilegon dengan menyediakan satu unit bus berkapasitas 50 penumpang tujuan Purwokerto, Jawa Tengah. Pelepasan mudik gratis tersebut dilaksanakan di depan Kantor Wali Kota Cilegon pada Minggu (15/03/2026).

https://www.bantennews.co.id/pt-irt-dukung-pemkot-cilegon-berangkatkan-warga-mudik-gratis/

IRT Supports Cilegon Youth through Creative Content Training

PT Indo Raya Tenaga (IRT) held a Creative Writing and Content Creation Training at SMA Negeri 4 Cilegon, Suralaya. The four-day training, conducted from Tuesday, October 21 to Friday, October 24, 2025, featured a speaker from the media and creative industry — Banten-based content creator and writer, Ade Ubaidil.

This activity marked the launch of the Sembilan Sepuluh Inisiasi untuk Generasi Masyarakat (SIGMA) program initiated by IRT. SIGMA demonstrates the company’s dedication to developing human resources and fostering community growth through continuous and inclusive training initiatives.


IRT Bekali Generasi Muda Cilegon Dengan Pelatihan Pembuatan Konten Kreatif

PT Indo Raya Tenaga (IRT) menggelar Pelatihan Penulisan dan Pembuatan Konten Kreatif di SMA Negeri 4 Cilegon, Suralaya. Pelatihan ini berlangsung selama empat hari, mulai Selasa, 21 Oktober 2025 hingga Jumat, 24 Oktober 2025, menghadirkan narasumber dari dunia media dan industri kreatif, yaitu content creator sekaligus sastrawan Banten, Ade Ubaidil.

Kegiatan ini menjadi pembuka dari program Sembilan Sepuluh Inisiasi untuk Generasi Masyarakat (SIGMA) yang diprakarsai IRT. SIGMA merupakan komitmen perusahaan dalam meningkatkan kualitas sumber daya manusia di sekitar wilayah operasional perusahaan melalui pelatihan berkelanjutan untuk berbagai kelompok masyarakat.

https://www.bantennews.co.id/irt-bekali-generasi-muda-cilegon-dengan-pelatihan-pembuatan-konten-kreatif/

We are proud to have received the Energy and Resources In-house Team of the Year award at the ALB Indonesia Law Awards 2025 held by Thomson Reuters and Asian Legal Business!

This award reflects the high standard that our in-house counsel team has continued to maintain throughout the project’s journey. And what a journey it has been! Ever since being recognized as the Project Finance Deal of the Year at the ALB Indonesia Law Awards 2021, our Jawa 9-10 USC Power Plant project and in-house counsel team has been nominated nearly every year. In fact, just a few months back, we were listed as one of the top five Energy and Resources In-house Team of the Year at the ALB Southeast Asia Law Awards 2025. After years of edging closer and closer to the peak, we are very happy to finally be here! Congratulations to the members of our in-house counsel team: Ms. Hanna Meliana, Mr. Yudhistira Wardana, Ms. Dinda Khamasasyiah, Ms. Yessy Muliawan, Mr. Djuan Dennis Sihotang, and Mr. Ivan Gautama!

The excellence that our in-house counsel team is recognized for also represents the collective strength and resilience throughout our other departments: where challenges are met, we rise to meet them together. Nothing less can be expected in our position as the independent power producer that operates the Jawa 9-10 USC Power Plant, especially when we aim to be the benchmark of energy transition in Indonesia.

Powering the Transition to NZE: this is not just a tagline for our 8th year anniversary but also represents the core principle of why we do what we do. As we move to a greener and more sustainably powered world, energy transition is a crucial and necessary phase that we must go through together. To that end, we employ the best minds and technology available – for instance, we are the first and only power plant in Indonesia to implement Ultra Super Critical (USC) with Selective Catalytic Reduction (SCR) Boiler technology to achieve next-level efficiency and emission reduction.

Last but not least, we could not have achieved everything that we have achieved at such a remarkable period of time had it not been for the constant support and assistance of our shareholders, sponsors, partners, and counsels. You have made our journey possible!

Jawa 9 & 10 USC Power Plant Officially Commences Operation as a Transitional NZE Power Plant to Strengthen the Java–Bali Electricity Supply

The Jawa 9 & 10 Ultra Super Critical (USC) Power Plant, located in Suralaya, Cilegon City, has officially entered its commercial operation and system normalization phase. As one of the most advanced USC power plants in Southeast Asia, this national strategic project supports the transition toward Net Zero Emissions.


Press Release: Pembangkit USC Jawa 9 & 10 Resmi Beroperasi, sebagai Pembangkit Transisi NZE untuk Perkuat Pasokan Listrik Jawa–Bali

Pembangkit Ultra Super Critical (USC) Jawa 9 & 10 yang berlokasi di Suralaya, Kota Cilegon, kini memasuki tahap operasi komersial dan normalisasi sistem. Proyek strategis nasional ini merupakan salah satu pembangkit USC paling modern di Asia Tenggara  yang mendukung transisi ke Net Zero Emission.

 

Link:

https://www.antaranews.com/berita/5162605/pembangkit-usc-jawa-9-dan-10-mulai-beroperasi

https://ekonomi.bisnis.com/read/20251008/44/1918792/pembangkit-usc-jawa-9-dan-10-cilegon-mulai-beroperasi

https://www.bantennews.co.id/pembangkit-usc-jawa-9-10-resmi-beroperasi-untuk-perkuat-pasokan-listrik-jawa-bali/

PLN award 2025

PLN Collaboration Award 2025

PT Indo Raya Tenaga (IRT) received the PLN Collaboration Award 2025 on June 10, 2025.

The award was presented in recognition of IRT’s excellent teamwork in addressing settlement matters throughout the construction and operational phases of the project. This acknowledgment reflects the company’s strong commitment to continuous improvement and long-term success, while also highlighting IRT’s outstanding contribution and value within the energy sector.


PLN Collaboration Award 2025

PT Indo Raya Tenaga (IRT) menerima PLN Collaboration Award 2025 pada tanggal 10 Juni 2025.

Penghargaan ini diberikan sebagai bentuk apresiasi atas kerja sama tim yang sangat baik dalam menangani berbagai hal terkait penyelesaian selama tahap konstruksi hingga operasional proyek. Pengakuan ini mencerminkan komitmen kuat perusahaan terhadap perbaikan berkelanjutan dan kesuksesan jangka panjang, sekaligus menegaskan kontribusi dan nilai strategis IRT di sektor energi.

Assistance in Providing Sacrificial Animals

As part of its support for the local community during Eid al-Adha, PT Indo Raya Tenaga, in collaboration with the EPC Contractor of Jawa 9 & 10, provided sacrificial animals to the residents of Suralaya Sub-district, Lebak Gede Sub-district, and Salira Village on June 5, 2025.


Bantuan Penyediaan Hewan Kurban

Sebagai bagian dari dukungannya kepada masyarakat setempat dalam perayaan Hari Raya Idul Adha, PT Indo Raya Tenaga, bekerja sama dengan Kontraktor EPC Jawa 9 & 10, memberikan hewan kurban kepada warga Kelurahan Suralaya, Kelurahan Lebak Gede, dan Desa Salira pada 5 Juni 2025.

Posts pagination

Page 1 Page 2 … Page 14 Next page

Find Us

Address
PT.Indo Raya Tenaga
Sentra Senayan II, Lt. 17
Jl. Asia Afrika Lot 8 Jakarta Pusat
Jakarta, Indonesia, 10270
T. +62(21) 57900202 F. +62(21) 57900208

Email. info@irt.co.id
www.irt.co.id

  • Home
  • About Us
  • Our Projects
  • News & Media
  • Contact Us
  • Multilanguage switcher
  • Career
Jakarta Office
Sentra Senayan II, Lt. 17
Jl. Asia Afrika No. 8 Jakarta Pusat
Jakarta, Indonesia, 10270
T. +62(21) 57900202 F. +62(21) 57900208
Suralaya & Lebak Gede Office
Site Office Proyek PLTU Jawa 9 & 10
Jalan Yos Sudarso, Kel. Suralaya,
Kec Pulomerak, Kota Cilegon
Banten 42439

Copyright © 2022 Indo Raya Tenaga

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are ok with it.Ok