Skip to content
INDO RAYA TENAGA

INDO RAYA TENAGA

INDO RAYA TENAGA

  • Home
  • About Us
    • Vision & Mission Value
    • Sponsor
    • Our Management
      • Board of Directors
      • Board of Commissioners
      • Senior Management & Advisor
  • Our Projects
    • Project Location
    • Summary of Project
    • Project Consultants
    • Technology
      • General Process
      • Steam Generator / Boiler
      • Steam Turbine & Generator
      • Environmental Technology
    • Ethics & Governance
      • Code of Ethics & Governance
      • Board Manual
      • Manpower Policy
    • Environment, Health, Safety & Sustainability
      • ESIA
      • Emission Control
      • EHS & ESMS
      • Stakeholders Management Plan
  • News & Media
    • Awards and Events
    • Project Milestones
    • Corporate Social Responsibilty
    • Bulletin
    • Press Release
    • E-Procurement ↗
  • Contact Us
  • Multilanguage switcher
  • Career

Blog

PT Indo Raya Tenaga Empowers Local Farmers Through the TANGGAP Program

As part of its commitment to environmental stewardship and community empowerment, PT Indo Raya Tenaga (IRT) launched a program called TANGGAP (Tenant Farmer Program). Focused on agriculture, this program is implemented on IRT-owned land located in Suralaya Sub-district. Initiated in May 2024, the program’s first planting activity took place in July 2024.

The program participants are members of the RETING (Revitalization of Hillside Crops Farmers Group), which was formed based on an agreement between PT IRT and the local community. The group consists of five members, all of whom are residents of Suralaya.
IRT provides capacity-building, training, and agricultural input support to each participant to ensure the program’s sustainability and success.


Berdayakan Petani Lokal, PT Indo Raya Tenaga Usung Program TANGGAP

Sebagai wujud kepedulian terhadap lingkungan kerja dan pemberdayaan masyarakat, PT Indo Raya Tenaga (IRT) melaksanakan program TANGGAP (Petani Penggarap). Program ini bergerak di bidang pertanian dan dilaksanakan di atas lahan milik IRT yang berlokasi di Kelurahan Suralaya. Dimulai pada Mei 2024, penanaman perdana dalam Program TANGGAP dilakukan pada Juli 2024.

Peserta program merupakan anggota Kelompok Petani Revitalisasi Tanaman Tebing (RETING), yang dibentuk atas dasar kesepakatan antara PT IRT dan masyarakat setempat. Kelompok ini terdiri dari lima anggota yang seluruhnya berasal dari Kelurahan Suralaya.
IRT memberikan pembinaan, pelatihan, serta bantuan sarana pertanian kepada setiap anggota kelompok untuk mendukung keberhasilan program ini.

Support for the ILP Program at Pulomerak Health Center

To support improved public health services, PT Indo Raya Tenaga donated two electric motorbikes to Pulomerak Health Center. This contribution reflects the company’s commitment to the government’s Primary Healthcare Integration (ILP) program. The donation was handed over during the official ILP launch at Pulomerak Health Center on May 6, 2025.


Dukungan Program ILP Puskesmas Pulomerak

Untuk mendukung peningkatan layanan kesehatan masyarakat, PT Indo Raya Tenaga memberikan bantuan dua unit motor listrik kepada Puskesmas Pulomerak. Bantuan ini merupakan wujud komitmen perusahaan terhadap program Integrasi Layanan Primer (ILP) yang dicanangkan oleh Kementerian Kesehatan. Penyerahan dilakukan bersamaan dengan peluncuran resmi program ILP di Puskesmas Pulomerak pada 6 Mei 2025.

PT Indo Raya Tenaga Promotes “Suralaya Waste-Free” Through Community Outreach

PT Indo Raya Tenaga (IRT) encouraged local communities and stakeholders to dispose of waste properly, particularly along the Suralaya River in Pulomerak District, Cilegon City. This message was conveyed during the “Suralaya Waste-Free Campaign” held at the Suralaya Sub-district Office on May 5, 2025. The event was attended by the Head of Suralaya Sub-district, representatives from the Cilegon City Environmental Agency (DLH), environmental practitioners, neighborhood leaders (RT heads), and residents living along the riverbanks.

The Head of the Sub-district, Sarmanah, expressed appreciation for IRT’s initiative and hoped for continued collaboration with the Cilegon City Government. A representative from DLH, Muhriji, who also served as a speaker, commended the activity and encouraged the community to gradually adopt proper waste management practices. Meanwhile, environmental activist Mad Haer provided education on the importance of understanding the sources and impacts of waste generated from daily community activities.


PT Indo Raya Tenaga Mendorong “Suralaya Bebas Sampah” melalui Kegiatan Sosialisasi kepada Masyarakat

PT Indo Raya Tenaga (IRT) mengajak masyarakat dan pemangku kepentingan setempat untuk membuang sampah pada tempatnya, khususnya di aliran Kali Suralaya, Kecamatan Pulomerak, Kota Cilegon. Ajakan ini disampaikan dalam kegiatan “Sosialisasi Suralaya Bebas Sampah” yang diselenggarakan di Kantor Kelurahan Suralaya pada 5 Mei 2025. Kegiatan ini dihadiri oleh Lurah Suralaya, perwakilan DLH Kota Cilegon, praktisi lingkungan, para Ketua RT, serta warga yang tinggal di sekitar bantaran sungai.

Kepala Kelurahan Suralaya, Sarmanah, menyampaikan apresiasi atas inisiatif IRT dan berharap kolaborasi ini terus berlanjut. Narasumber dari DLH Kota Cilegon, Muhriji, juga mengapresiasi kegiatan tersebut dan mengharapkan masyarakat dapat mulai menerapkan pengelolaan sampah secara bertahap. Sementara itu, penggiat lingkungan Mad Haer memberikan edukasi kepada warga tentang pentingnya memahami sumber dan dampak sampah dari aktivitas sehari-hari.

Plant Commercial Operation Date (COD)

The Plant’s Commercial Operation Date (COD) was officially achieved on May 2, 2025, marking the full commencement of Jawa 9 & 10’s power generation operations. This milestone confirms that both units have successfully completed all required testing, commissioning, and regulatory compliance processes, and are now operating at full capacity to supply electricity to the national grid on a commercial basis.


Plant Commercial Operation Date (COD)

Commercial Operation Date (COD) Pembangkit secara resmi ditetapkan pada 2 Mei 2025, menandai dimulainya operasi pembangkitan listrik Jawa 9 & 10 secara penuh.Tonggak pencapaian ini menegaskan bahwa kedua unit telah menyelesaikan seluruh proses pengujian, komisioning, dan pemenuhan ketentuan regulasi, serta kini beroperasi dengan kapasitas penuh untuk memasok listrik ke jaringan nasional secara komersial.

Plant COD 2 May 2025

K3 Award (Occupational Health and Safety Award) 2025 from the Banten Provincial Government

PT Indo Raya Tenaga (IRT) was honored with the K3 Award (Occupational Safety and Health Award) 2025 by the Banten Provincial Government on April 23, 2025. This award reflects the company’s strong and continuous commitment to upholding occupational safety and health standards.

The recognition covered three categories: Zero Workplace Accidents throughout 2024, a Platinum rating for the Occupational Safety and Health Committee (P2K3), and a Platinum rating for the Workplace HIV/AIDS Prevention and Control Program.


Penghargaan Keselamatan dan Kesehatan Kerja (K3) Tahun 2025 dari Pemerintah Provinsi Banten

PT Indo Raya Tenaga (IRT) menerima Penghargaan Keselamatan dan Kesehatan Kerja (K3) Tahun 2025 dari Pemerintah Provinsi Banten pada tanggal 23 April 2025. Penghargaan ini merupakan bentuk apresiasi atas komitmen perusahaan dalam menerapkan standar keselamatan dan kesehatan kerja secara konsisten.

Dalam kesempatan tersebut, tiga kategori pengakuan didapatkan, yaitu sebagai Perusahaan Nihil Kecelakaan kerja selama periode tahun 2024, Panitia Pembina Keselamatan dan Kesehatan Kerja (P2K3) dengan peringkat nilai Platinum, serta Program Pencegahan dan Penanggulangan HIV/AIDS di Tempat Kerja dengan peringkat nilai Platinum.

Carbon Capture and Storage (CCS) study funded by the Asian Development Bank (ADB)

From March 10 to 14, 2025, the Asian Development Bank (ADB) in collaboration with Karbon Korea organized a Technical Training Workshop on Carbon Capture and Storage (CCS) in Seoul, South Korea.

The workshop aimed to enhance participants’ understanding of CCS technologies and their practical applications. Held at Fraser Place Namdaemun Hotel, the program featured expert-led lectures on topics such as carbon capture methods, carbon tax and market mechanisms, emissions trading systems, and real-world implementation strategies.

The event was attended by 20 participants from Indonesia, representing various ministries and private companies, including two representatives from PT Indo Raya Tenaga.


Studi Penangkapan dan Penyimpanan Karbon (Carbon Capture and Storage/CCS) yang didanai oleh Asian Development Bank (ADB)

Pada tanggal 10 hingga 14 Maret 2025, Asian Development Bank (ADB) bekerja sama dengan Karbon Korea menyelenggarakan Lokakarya Pelatihan Teknis mengenai Penangkapan dan Penyimpanan Karbon (Carbon Capture and Storage/CCS) di Seoul, Korea Selatan.

Lokakarya ini bertujuan untuk meningkatkan pemahaman peserta terhadap teknologi CCS dan penerapannya secara praktis. Bertempat di Fraser Place Namdaemun Hotel, program ini menghadirkan sesi-sesi pemaparan oleh para ahli dengan topik mencakup metode penangkapan karbon, mekanisme pajak dan pasar karbon, sistem perdagangan emisi, serta strategi implementasi di lapangan.

Kegiatan ini diikuti oleh 20 peserta dari Indonesia yang mewakili berbagai kementerian dan perusahaan swasta, termasuk dua perwakilan dari PT Indo Raya Tenaga.

 

 

Unit Commercial Operation Date (COD) – Unit 1

The Commercial Operation Date (COD) for Unit 1 was officially achieved on March 5, 2025, marking the beginning of full-scale electricity production and delivery to the national grid. This milestone signifies the successful completion of all testing and commissioning activities, confirming that Unit 1 has met the technical, safety, and environmental requirements for continuous commercial operation.


Unit Commercial Operation Date (COD) – Unit 1

Commercial Operation Date (COD) Unit 1 secara resmi tercapai pada 5 Maret 2025, menandai dimulainya produksi dan penyaluran listrik skala penuh ke jaringan nasional. Tonggak pencapaian ini menunjukkan bahwa seluruh kegiatan pengujian dan komisioning telah berhasil diselesaikan, serta mengonfirmasi bahwa Unit 1 telah memenuhi persyaratan teknis, keselamatan, dan lingkungan untuk beroperasi secara komersial secara berkelanjutan.

 

First Synchronization Unit 2

The first synchronization of Unit 2 Steam Turbine Generator (STG) to the grid on January 28, 2025, signifies the start of power generation from the unit. This achievement confirms the readiness of the generator to operate in parallel with the national grid, paving the way for further testing and commercial operation.


Sinkronisasi Perdana Unit 2

Sinkronisasi awal Generator Turbin Uap (STG) Unit 2 ke jaringan listrik pada 28 Januari 2025 menandai tahapan awal pembangkitan daya dari unit tersebut. Keberhasilan ini menunjukkan bahwa generator telah siap beroperasi selaras dengan jaringan listrik nasional, sekaligus memulai fase pengujian lanjutan menuju operasi komersial.

Fish Seeding Activity at Situ Rawa Arum

To demonstrate its commitment to social responsibility and environmental preservation, PT Indo Raya Tenaga conducted a fish stocking event at Situ Rawa Arum on December 7, 2024. Situ Rawa Arum, located in Link. Tegalwangi, Rawa Arum Sub-district, Gerogol District, Cilegon City, was officially designated as a nature tourism site in 2013.


Tebar Benih Ikan di Situ Rawa Arum

Sebagai wujud komitmen sosial dan pelestarian lingkungan, PT Indo Raya Tenaga menyelenggarakan kegiatan tebar benih ikan di Situ Rawa Arum pada 7 Desember 2024. Situ Rawa Arum yang terletak di Link. Tegalwangi, Kelurahan Rawa Arum, Kecamatan Gerogol, Kota Cilegon resmi ditetapkan sebagai wisata alam sejak 2013.

Posts pagination

Previous page Page 1 Page 2 Page 3 … Page 14 Next page

Find Us

Address
PT.Indo Raya Tenaga
Sentra Senayan II, Lt. 17
Jl. Asia Afrika Lot 8 Jakarta Pusat
Jakarta, Indonesia, 10270
T. +62(21) 57900202 F. +62(21) 57900208

Email. info@irt.co.id
www.irt.co.id

  • Home
  • About Us
  • Our Projects
  • News & Media
  • Contact Us
  • Multilanguage switcher
  • Career
Jakarta Office
Sentra Senayan II, Lt. 17
Jl. Asia Afrika No. 8 Jakarta Pusat
Jakarta, Indonesia, 10270
T. +62(21) 57900202 F. +62(21) 57900208
Suralaya & Lebak Gede Office
Site Office Proyek PLTU Jawa 9 & 10
Jalan Yos Sudarso, Kel. Suralaya,
Kec Pulomerak, Kota Cilegon
Banten 42439

Copyright © 2022 Indo Raya Tenaga

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are ok with it.Ok