Skip to content
INDO RAYA TENAGA

INDO RAYA TENAGA

INDO RAYA TENAGA

  • Home
  • About Us
    • Vision & Mission Value
    • Sponsor
    • Our Management
      • Board of Directors
      • Board of Commissioners
      • Senior Management & Advisor
  • Our Projects
    • Project Location
    • Summary of Project
    • Project Consultants
    • Technology
      • General Process
      • Steam Generator / Boiler
      • Steam Turbine & Generator
      • Environmental Technology
    • Ethics & Governance
      • Code of Ethics & Governance
      • Board Manual
      • Manpower Policy
    • Environment, Health, Safety & Sustainability
      • ESIA
      • Emission Control
      • EHS & ESMS
      • Stakeholders Management Plan
  • News & Media
    • Awards and Events
    • Project Milestones
    • Corporate Social Responsibilty
    • Bulletin
    • Press Release
    • E-Procurement ↗
  • Contact Us
  • Multilanguage switcher
  • Career

Blog


Grievance Form

You came from :
Country: United States
City : Palmdale
IP : 216.73.216.76
MaleFemale
Please specify your location (required) :
I wish to raise my grievance anonymously
I request not to disclose my identity without my consent
Preferred Language for communication
EnglishOther, please specify
Please mark how you wish to be contacted (mail, telephone, e-mail).
By E-mailBy Telephone

Signing of Engineering, Procurement, and Construction (EPC) Contract’s Limited Notice to Proceed

The Signing of the Limited Notice to Proceed (LNTP) for the EPC Contract took place on May 8, 2019. This marked an important step in the project implementation process, allowing initial work activities such as detailed engineering design, procurement of long lead items and early site preparation to commence ahead of the full EPC contract execution.


Penandatanganan Pemberitahuan Terbatas untuk Memulai Pekerjaan (Limited Notice to Proceed) Kontrak EPC

Penandatanganan Pemberitahuan Terbatas untuk Memulai Pekerjaan (Limited Notice to Proceed/LNTP) untuk Kontrak EPC dilaksanakan pada tanggal 8 Mei 2019. Penandatanganan ini merupakan langkah penting dalam proses pelaksanaan proyek, yang memungkinkan dimulainya beberapa kegiatan awal seperti perancangan teknik terperinci, pengadaan peralatan dengan waktu pengiriman panjang, serta persiapan awal di lokasi proyek, sebelum pelaksanaan menyeluruh dari kontrak EPC.

Signing of Engineering, Procurement, and Construction (EPC) Contract with Doosan-HK Consortium

PT Indo Raya Tenaga officially signed an Engineering, Procurement, and Construction (EPC) contract with the Doosan-HK Consortium for the development of the Jawa 9 & 10 USC CFSPP Project on March 20, 2019. The signing marks a significant milestone in the project’s lifecycle, representing the commencement of the full-scale implementation phase.


Penandatanganan Kontrak Engineering, Procurement, and Construction (EPC) dengan Konsorsium Doosan-HK

PT Indo Raya Tenaga secara resmi menandatangani kontrak EPC dengan Konsorsium Doosan-HK untuk pembangunan Proyek PLTU USC Jawa 9 & 10 pada tanggal 20 Maret 2019. Penandatanganan ini menandai tonggak penting dalam siklus proyek, yang mencerminkan dimulainya fase pelaksanaan secara menyeluruh.

 

Signing of the Amended and Restated Purchase Agreement for Cooperation in the Power Provision

On December 18, 2018, PT PLN (Persero) and PT Indo Raya Tenaga (IRT) officially signed the Amended and Restated Purchase Agreement for Cooperation in Power Provision for the Jawa 9 & 10 USC CFSPP Project. The signing marks a key milestone in the realization of the national energy strategy to enhance reliable, efficient, and environmentally responsible power generation infrastructure.


Penandatanganan Perjanjian Pembelian yang Telah Diamendemen dan Dinyatakan Kembali untuk Kerja Sama Penyediaan Tenaga Listrik.

Pada tanggal 18 Desember 2018, PT PLN (Persero) dan PT Indo Raya Tenaga (IRT) secara resmi menandatangani Perjanjian Pembelian yang Telah Diamendemen dan Dinyatakan Kembali (Amended and Restated Purchase Agreement) untuk Kerja Sama Penyediaan Tenaga Listrik pada Proyek PLTU Jawa 9 & 10 USC. Penandatanganan ini menjadi tonggak penting dalam mewujudkan strategi energi nasional guna menghadirkan infrastruktur pembangkit listrik yang andal, efisien, dan ramah lingkungan.

Raudhatul Jannah Mosque

 

The Java 9 & 10 power plant project in Suralaya is the only newest generation electricity project that successfully entered the funding process after more than two years of processing with PLN so that it complies with Minister of Energy and Mineral Resources Regulation No. 10 of 2017.

The Java 9 & 10 power plant was developed by utilizing Ultra Super Critical technolog

y made from OECD countries with various advantages, such as: efficient and reliable coal consumption and more environmentally friendly according to international standards and OECD guideline (with dust catching equipment, sulfur, and others).

In its development, The Java 9 & 10, which managed by PT Indo Raya Tenaga, is

a collaborative project between a state-owned subsidiary and a national private company that promotes the principles of integrity, measurable investment, professionalism, and care for social and community aspects.

PT Indo Raya Tenaga congratulates the opening of the Raudhatul Jannah Mosque at the end of 2018.

Signing of the Memorandum of Understanding (MoU) between PT Indo Raya Tenaga and Doosan Heavy Industries and Construction

PT Indo Raya Tenaga signed a memorandum of understanding (MoU) with Doosan Heavy Industries and Construction for the construction of Jawa 9 & 10. The signing of the memorandum of understanding was carried out at the Korea-Indonesia Industrial Cooperation Forum held at Lotte Hotel, Jung-gu, Seoul on September 10, 2018. The signing of the cooperation agreement was witnessed by President Joko Widodo, Minister of Industry Airlangga Hartarto, Chairman of the Investment Coordinating Board Thomas Lembong, South Korea’s Minister of Trade and Industry Baek Woon Gyu, and Yun Seok Won, Head of the EPC Business Group of Doosan Heavy Industries & Construction.


Penandatanganan Nota Kesepahaman (MoU) antara PT Indo Raya Tenaga dan Doosan Heavy Industries and Construction

PT Indo Raya Tenaga menandatangani nota kesepahaman (MoU) kerja sama dengan Doosan Heavy Industries and Construction untuk pembangunan Jawa 9 & 10. Penandatanganan nota kesepahaman tersebut dilakukan dalam Forum Kerja Sama Industri Korea-Indonesia yang diselenggarakan di Lotte Hotel, Jung-gu, Seoul, pada tanggal 10 September 2018. Penandatanganan perjanjian kerja sama ini disaksikan oleh Presiden Joko Widodo, Menteri Perindustrian Airlangga Hartarto, Kepala Badan Koordinasi Penanaman Modal Thomas Lembong, Menteri Perdagangan dan Industri Korea Selatan Baek Woon Gyu, serta Yun Seok Won selaku Kepala EPC Business Group dari Doosan Heavy Industries & Construction.

Suralaya Power Plant

State utility company PT Perusahaan Listrik Negara (PLN) said it will develop Unit 9 and 10 of Suralaya coal-fired power plant (PLTU Suralaya), with an installed capacity of 1,000 MW each. The new units will utilize ultra-supercritical technology that allows the company to improve efficiency as well as reduce emissions significantly.

General Manager Indonesia Power UP Suralaya Amlan Nawir told reporters Saturday that the unit will use less energy to produce 1 kWh of electricity.

He said based on the company’s study, the USC technology could help cut costs by 38-40% than the current technology.

The power plant units will be built on 60 hectares of land. Each unit will have the installed capacity of 1,000 MW, higher than the existing units of 400 MW and 600 MW.

The power plants will use coal with calorie of 4,900-,5,100, supplied by state-owned coal producer PT Bukit Asam Tbk (IDX:PTBA), PT Adaro Energy Tbk (IDX:ADRO), PT Kideco Jaya Agung and others.

The costs to develop the two power plants are estimated to reach Rp46 trillion. PLN unit PT Indonesia Power holds 51% stake in the joint venture company that will build the power plants and the remaining 49% shares are owned by PT Barito Wahana Lestari, a subsidiary of PT Barito Pacific.

Indonesia Power currently operates 14,826 MW of power plants located in Suralaya, Semarang, Perak Grati, Saguling, Bali, Mrica, Priok and Kamojang as operates 13 units owned by the parent company. (*)

 

Ground Breaking Jawa 9 & 10

The groundbreaking of Jawa 9 & 10, 2 x 1000 MW CFSPP Project which was attended by President Joko Widodo on October 5, 2017.


Ground Breaking Jawa 9 & 10

Groundbreaking Proyek Jawa 9 & 10, 2x 1000 MW CFSPP yang dihadiri oleh Presiden Joko Widodo pada tanggal 5 Oktober 2017.

Invitation for prequalification for technical consultancy services

 

Ref No: 1-0026 No. Ref: 1-0026

PT Indo Raya Tenaga (“PT IRT”) hereinafter referred to as COMPANY, a power generation company which is an operational collaboration between PT Putra Indotenaga, a subsidiary of PT Indonesia Power and PT Barito Wahana Lestari, intends to carry out the auction of Technical Consultancy Services (“Owner’s Engineer”) where the main function and responsibility of the Service is to support / provide technical assistance and project management advice to supervise and ensure the EPC project is carried out safely, fulfilling requirements of Environmental, Health, Safety (EHS) and Quality, following the project management, technical standards, application of techniques and EPC contract requirements.

PT IRT hereby invites prospective bidders who have the experience, skills and licensing required to participate in the prequalification for the services mentioned above.

General prequalification criteria are as follows:

  1. Procurement participants are companies engaged in the business of technical consultants with experience as a full-scope Owner’s Engineer from the project owner’s side in building coal-fired power plants. Procurement participants are companies from Indonesia and / or from OECD countries that have diplomatic relations with Indonesia, have subsidiaries established in Indonesia or must form a consortium together with local companies that have equal competence.
  2. In terms of forming a consortium, the maximum number of members in the consortium consists of 3 (three) companies. The consortium leader must have the largest contribution of the work value and the consortium members must have a minimum contribution of 10% of the total work value.
  3. Bidder must show sufficient evidence that they have at least two (2) coal-fired power projects with a minimum of 500 MW in ten (10) years. One project must be an ultra-supercritical (“USC”) type that has been successfully operating with sufficient evidence of involvement in USC’s main equipment. Also must have at least 1 (one) positive recommendation from a previous large / ongoing project.
  4. The legal entities of the procurement participants are from Indonesia and / or OECD countries provided that the procurement participants will not come from the offshore origin country of the EPC contractor contracting with the Company (“EPC Contractor”).
  5. Have a team of at least 5 core consultants experienced in USC type power plants and 5 core consultants for three (3) years who have been permanent workers in prospective bidders’ organizations. Five (5) core consultants must have their respective backgrounds and expertise in the fields of boilers, turbines, generator electricals, balance of plants and water treatment systems as proven by certifications issued by professional institutions and / or related companies.
  6. Does not have a conflict of interest with the project and business of the EPC Contractor / has no affiliation or business relationship with the EPC Contractor.
  7. Proven and able to show management system / procedure as a Corporate Engineering Consultant / Owner’s Engineer, including having a corporate EHS procedure.
  8. Not undergoing suspension or blacklisting by the Project Owner and / or Sponsor (PLN, Barito, IP) or its affiliates or government agencies and is not in the process of resolving disputes with the court.
  9. Prospective bidders must also submit the following administrative documents:
  • Deed of incorporation which contains the company’s articles of association and all amendments and approval issued by the authorized agency.
  • Business license in valid business fields issued by the authorized government agency.
  • Certificate of domicile that is still valid.
  • Company Registration Number (TDP) or Main Business Number.
  • Electricity Supporting Services Business Entity Certificate (SBUJPTL) and Electricity Supporting Services Business License (IUJPTL). If you don’t have it, submit the application letter for SBUJPTL and IUJPTL.
  • A copy of the company’s last year’s financial statement audited by the Public Accounting Firm.
  • Tax ID Number.
  • Taxable Employer Confirmation Letter.
  • Proof of payment of last year’s tax liability for income tax Article 25 and the last three months, Article 21 or Article 23 and VAT.
  • Evidence of registration of workers who are members of a core consultant at the Social Security Organizing Agency (BPJS) and. Prospective bidders must submit a statement that will process the plan for the use of foreign workers (RPTKA) along with permits to employ foreign workers (IMTA) for workers who are not Indonesian citizens.
  • Minimum memorandum of understanding if prospective bidder is in the form of a consortium.

Prospective bidders can register for the prequalification meeting on 29 January 2019 to 30 January 2019 from 09:00 am to 3:00 pm at the following address:

Procurement Committee

PT Indo Raya Tenaga

For the attention of the Bid Committee,

Sentral Senayan II, 17th Floor, Suite 217B,

Jl. Asia Afrika no.8, Gelora Bung Karno,

Jakarta Pusat 10270, Indonesia

Prospective bidders must be represented by members of the Board of Directors who have the capacity in accordance with the company’s articles of association in conducting prequalification registration. If a member of the Board of Directors who has the capacity cannot represent for any reason, a member of the Board of Directors who has the capacity can be represented by a proxy who carries a special authorized power of attorney.

Prospective bidders are also invited to the prequalification meeting where the schedule will be notified to prospective bidders when registering for prequalification.

Only prospective bidders who attend the prequalification meeting and pass the prequalification will be invited to participate in the auction process.

Invitation for international competitive offering for engineering, procurement, construction, and testing of coal power plant 9 & 10 in java (2 × 1000 mw) in suralaya, banten province, indonesia

 

No: 001.Peng / 60 / EPC-PLTU / IRT / 2017

PT Indo Raya Tenaga (“PT IRT”), a power generation company which is an operational collaboration between PT Putra Indo Tenaga, a subsidiary of PT Indonesia Power, and PT Barito Wahana Lestari, intends to build the Java-9 Coal Fired Power Plant & 10 (2 × 1000 MW), with Ultra Supercritical technology and Net Reliability 2 (two) times 1000 MW, in Suralaya, Banten Province, Indonesia (“Project”).

PT IRT invites bidders to participate in international competitive offers with post-qualifications for the completion of the Project engineering, procurement, construction and testing (“EPC”) workload, the details of which will be available in the Bidding Document. Bidding will be done in 2 (two) Stages.

The project will be funded in part by PT IRT’s personal funds and / or in part by commercial financing and / or the Export Credit Agency (ECA) financing scheme. The bidders will propose prospective Lenders who will provide loan funds without Government Guarantees.

The general qualification criteria for the Bidder are as follows (all other criteria will be available in the Bidding Document):

  1. Bidder is a foreign company from an OECD country that has diplomatic relations with Indonesia, and has a subsidiary established in Indonesia, or has to form an Operational Cooperation / Consortium with a competent local contractor company;
  2. The maximum number of members in an Operational Cooperation / Consortium consists of 4 (four) companies, each of which has a participation value of not less than 10 (ten) percent;
  3. Bidder or in this case at least one of the members of the Operations Cooperation / Consortium if it is an Operations Cooperation / Consortium, must show sufficient evidence that they have had experience in the last 15 (fifteen) years, at least 1 (one) completion work EPC contract in a Supercritical Coal Steam Power Plant with a minimum capacity of 500 MW, which has been successfully operating no less than two (2) years from the date of commercial operations outside its country of origin.

Prospective bidders can register and take the Bidding Document after making a non-refundable payment of Rp. 30,000,000 on August 22 to August 25 2017 from 09.00 am to 03.00 pm at the following address:

PT Indo Raya Tenaga

For Attention: The EPC Procurement Committee for USC Java-9 & 10 USC Coal Fired Power Plants, and with NDC 2 × 1000 MW

d / a: ABNR – Graha CIMB Niaga, 24th Floor

Prospective bidders must be represented by members of the Board of Directors who have the capacity in accordance with the articles of association of the company in registering and taking Bid Documents. If a member of the Board of Directors who has the capacity cannot represent for any reason, a member of the Board of Directors who has the capacity can be represented by a proxy who carries a special authorized power of attorney.

Posts pagination

Previous page Page 1 … Page 13 Page 14

Find Us

Address
PT.Indo Raya Tenaga
Sentra Senayan II, Lt. 17
Jl. Asia Afrika Lot 8 Jakarta Pusat
Jakarta, Indonesia, 10270
T. +62(21) 57900202 F. +62(21) 57900208

Email. info@irt.co.id
www.irt.co.id

  • Home
  • About Us
  • Our Projects
  • News & Media
  • Contact Us
  • Multilanguage switcher
  • Career
Jakarta Office
Sentra Senayan II, Lt. 17
Jl. Asia Afrika No. 8 Jakarta Pusat
Jakarta, Indonesia, 10270
T. +62(21) 57900202 F. +62(21) 57900208
Suralaya & Lebak Gede Office
Site Office Proyek PLTU Jawa 9 & 10
Jalan Yos Sudarso, Kel. Suralaya,
Kec Pulomerak, Kota Cilegon
Banten 42439

Copyright © 2022 Indo Raya Tenaga

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are ok with it.Ok